How we work.

Every job runs the same way. You know what happens next.

Six steps.

01

Enquire

Send the quote form. Photos of the area and switchboard help.

02

Assess

From photos, drawings or a site visit.

03

Quote

Written and itemised, with exclusions listed.

04

Book

A confirmed date and notice of any power shutdown.

05

Install

Built and tested to AS/NZS 3000.

06

Sign off

Certified and explained before we leave.

How our quotes are built.

Itemised

Every part of the job on its own line.

Exclusions listed

What is not included is written down.

Options shown

If there is a cheaper or better way, you see both.

Variations approved

Scope changes are priced in writing first.

Ready to start?

Step one takes a minute.

Request a quote