How we work.
Every job runs the same way. You know what happens next.
Six steps.
01
Enquire
Send the quote form. Photos of the area and switchboard help.
02
Assess
From photos, drawings or a site visit.
03
Quote
Written and itemised, with exclusions listed.
04
Book
A confirmed date and notice of any power shutdown.
05
Install
Built and tested to AS/NZS 3000.
06
Sign off
Certified and explained before we leave.
How our quotes are built.
Itemised
Every part of the job on its own line.
Exclusions listed
What is not included is written down.
Options shown
If there is a cheaper or better way, you see both.
Variations approved
Scope changes are priced in writing first.
